Dzierżoniów MCNS manufacturing hall

Execution: 06 – 11.2017 

Total volume: Stage I 9500 cu m, Stage II

Scope:

Ventilation and air-conditioning system installation for the hall backlot, hydrant installation along with a feed connection, process heating of the chemical substance container heating room using steam.

Installation of a ventilation and air-conditioning system for hall backlot rooms with a total volume of 1,300 cu m3.

Execution of water main connection of 55 m along with a hydrant installation in the hall.

Execution of steam heating system for the container for the chemical substance storage heating, with a capacity of ca. 100 kW.

Works included the development of the concept and project documentation