Reserved store at the Pasaż Grunwaldzki shopping centre, Wrocław, Poland

Execution: 05-09.2017

Surface area: 2 500m2

Scope:

Comprehensive execution of the ventilation and air-conditioning system for the entire unit and of the water supply and sewage removal system in the store bathrooms.

Installation of fire safety insulation on the smoke removal system.

Installation of a ventilation system with a capacity of 18,300 m3/ h.

Installation of a ventilation system composed of 18 heat pumps with a total cooling capacity of 260 kW.

Execution of a comprehensive water supply and sewage removal system for the store bathrooms.

Removal of the system left by the previous tenant.

Execution of fire protection insulation on the smoke removal system in the store.