Wrocław, Sinsay, Cropp, House stores at the Pasaż Grunwaldzki shopping centre

Execution: 02-04.2018

Total surface area: 1 500m2

Scope:

Comprehensive execution of ventilation and air-conditioning systems in three units.

Installation of a ventilation system with a total performance capacity of 9,000 m3/ h.

Installation of an air-conditioning system with a total of 12 in-duct heat pumps, along with necessary equipment.

Execution of entire water supply and sewage removal systems for the store bathrooms.